Specifications include, but are not limited to: The following shall include all labor, materials, equipment, and supervision to perform the following scope of work: Mechanically fasten flute filler insulation and 1” Polyisocyanurate insulation to the existing metal roof Mechanically fasten a 60 mil TPO roof system Roof system shall extend up and over parapet wall underneath flashing Properly flash all curbs, walls, penetrations, and roof edge Install new cap metal to the flashed in walls Tear off old & damaged material and replace with new, i.e. venting boots, etc. Replacement of old or damaged materials must be approved by the Fire Chief or Fire Marshall before being replaced. Provide a minimum manufacture’s 15 year no dollar limit warranty Provide a minimum 2 - year contractor’s warranty Clean up the site and dispose of waste properly In between “work days” roof shall be properly protected from any further damage due to weather condition