Specifications include, but are not limited to: Provide labor, material and necessary equipment to paint exterior walls, concrete block, windows, and metal railings. Paint must be exterior grade rated for the type of surface being applied to. Paint must have fade resistant additive. All surfaces must be prepped prior to painting. All work must be done during normal working hours Any work requiring scaffolding or lifts must be set up so that fire engines can still respond out of the stations. Clean up job site at the end of each day at end of the job is required unless otherwise approved. Water, power, lighting and storage of materials shall be provided by contractor unless otherwise approved. Contractor must be licensed and insured