Specifications include, but are not limited to: Drill and puncture pathways for installation in floors, walls, and ceilings Install any conduit and raceway to completely hide new cabling end-to-end and meeting building construction codes (for raceway, screwing to walls will be necessary as we don’t want to rely on the sticky tape) Painting any installed conduit and raceway Running new Cat6 cable between each room and the building’s data closet in the 1st floor breezeway Terminating the new Cat6 network drops on each end Installation of any recessed or surface boxes in the rooms being sure to secure them to the wall (if surface mounted do not use the sticky tape) and installing the faceplate with the terminated keystone inserted ; Labeling the new Cat6 network drops on each end.