Specifications include, but are not limited to: A. Furnish and Install 15”CPP and FES 1 LS @____________$/LS ______________ B. Furnish and Install 12” Rip Rap 5 CY @____________$/CY _____________ C. Rain Garden Overflow Wall 1 LS @_____________$/LS _____________ D. Install Concrete Gutter Section & Class 7 Base 156 LF @____________$/LF _____________ E. Furnish & Install Rain Garden including 1 LS @_____________$/LS _____________ Excavation, Gravel, Fabric, Blended Soil, & Rock Mulch F. 5’ Sidewalk Including Thick Edge, WWM, 850 SF @____________$/SF _____________ Class 7 Aggregate, Excavation, and Restoration G. Furnish and Install 2’x 2’x 3’ Minimum Boulders 6 EA @_____________ $/EA ___________ TOTAL BID SCHEDULE 1 $ ____