Specifications include, but are not limited to: The Work generally includes relocation of water mains, a water transmission line, installation of new gravity sewer line, and abandonment of an existing sanitary lift station in advance of the start of construction work on interchange road improvements. Water line 1 includes installation of approximately 770 linear feet of 8-inch PVC water main near N. Shiloh Drive north of W. Wedington Drive. Water line 2 includes installation of approximately 1,175 linear feet of 24-inch DIP transmission main and associated 42-inch steel casing crossing ARDOT right of way. Water line 3 includes installation of approximately 700 linear feet of 8- inch PVC water main near Futrall Drive south of W. Wedington Drive. The sanitary sewer includes approximately 1,094 linear feet of 12-inch PVC gravity sewer near Futrall Drive south of W. Wedington Drive. Lift Station #10 located near Futrall Drive south of W. Wedington Drive will be demolished as part of this work.