Specifications include, but are not limited to: Schedule A: Site 1 of Bryant Parkway. The major items of work include, but are not limited to 6,700 L.F. of roadway construction including 93,000 C.Y. of embankment construction, 10,000 cubic yards of unclassified excavation, 18,500 Tons of Aggregate Base Course, 9,000 Tons of ACHM Surface and Binder Course, 3,300 L.F. of R.C. Pipe, a Double 10’x5’ R.C. Box Culvert, and a Triple 12’x8’ R.C. Box Culvert, and 9,300 L.F. of Curb and Gutter as shown on the plans and indicated in the specifications. Schedule B: Site 3 of Bryant Parkway. The major items of work include, but are not limited to 2,270 L.F. of roadway construction including 8,000 C.Y. of embankment construction, 13,100 C.Y. of unclassified excavation, 6,000 Tons of Aggregate Base Course, 3,250 Tons of ACHM Surface and Binder Course, 2,350 L.F. of R.C. Pipe, and 6,050 L.F. of Curb and Gutter as shown on the plans and indicated in the specifications. Schedule C: Site 1 and Site 3 of Bryant Parkway. This schedule represents the work required to complete all items of work shown in both Schedule A and Schedule B, as shown on the plans and indicated in the specifications.