Specifications include, but are not limited to: All work shall be performed in a professional, neat, and orderly manner as not to disrupt school business. All base and surface materials are to be appropriately compacted with a vibratory plate compactor or rollers All materials submitted under this IFB must meet all appropriate State and Federal regulations and standards Contractor shall be licensed as required by Arkansas State Law and comply with applicable State and Federal regulations and standards. All work is to be done according to applicable prevailing local codes with inspections as required. All cracked areas that require overlay, shall be broomed if necessary before seal coat repairs are done. Remove surface and base, as deep as necessary, to reach firm support on deep patch repairs. If water is the cause of the failure, improve existing or install new drainage system, after approval is given by the Owner. Tack coat to vertical face shall be applied. When backfill is required, a dense-graded hot asphalt plant-mix or approved equal will be used. Spread mix carefully to prevent segregation of the mixture.