Specifications include, but are not limited to: 1 Asphalt Concrete Hot Mix Surface Course Type 3 (1/2” max stone), per AHTD Specifications, PG 64-22, no millings allowed or shingles allowed 3000 X $________________ = $_______________ 2 Asphalt Concrete Superpave surface course, PG-76-22 per AHTD specifications (12.5mm max stone), no millings allowed or shingles allowed 2000 X $________________ = $_______________ 3 Asphalt Concrete Superpave Surface Course, PG 70-22 per AHTD Specifications (12.5 mm max stone), no millings or shingles allowed 2000 X $________________ = $_______________ 4 Asphalt Concrete Hot Mix Surface Course Type 3 (1/2” Max stone), per AHTD Specifications, PG 64-22, including recycled shingles as specified 2000 X $________________ = $_______________ 5 Asphalt Concrete Superpave Surface Course, PG 76-22 per AHTD Specifications (12.5 mm max stone) including recycled shingles as specified 1000 X $________________ = $_______________ 6 Asphalt Concrete Superpave Surface Course, PG 70-22 per AHTD Specifications (12.5 mm max stone), millings allowed 1500 X $________________ = $_______________