Specifications include, but are not limited to: A. Remove existing modified bitumen roofing and substrate to existing tongue and groove structural wood deck. B. Repair or replacement and preparation of existing roofing tongue and groove structural wood deck. (Allow $5000.00 for replacement of damaged roof deck and concealed materials.) C. Roofing manufacturer's requirements for the specified warranty. D. Install wood nailers for roofing attachment. (2.02.A) E. New tapered insulation as required for membrane roofing. (2.01.C) F. New elastomeric membrane roofing by Firestone or approved equal. (2.01.A) G. Remove and replace metal roof edging and copings. (4.05) H. Remove and replace all flashings including parapet cap flashings. (4.05) I. New walkway pads. (2.01.M) J. Remove and replace roof drains. (2.01.L) K. Repair and preparation of existing conductors to receive new roof drains. L. Other roofing-related items specified or indicated or otherwise necessary to provide a complete weatherproof roofing system. M. Remove and replace wood glue-lam end caps and trim; match existing materials; prep and paint. (3.02 Painting) N. Remove and replace trim, soffits, and fascias; match existing materials; prep and paint. Fascias appear to be T-111 plywood at building perimeter and are painted blue. (3.02 Painting)