THE PURPOSE OF THIS PROJECT IS TO MILL AND OVERLAY APPROXIMATELY 6.279 MILES OF HIGHWAYS 5 AND 70 IN PULASKI COUNTY. THIS PROJECT CONSISTS OF ACHM SURFACE COURSE, COLD MILLING ASPHALT PAVEMENT, ACHM PATCHING OF EXISTING ROADWAY, MAINTENANCE OF TRAFFIC, LOOP WIRING, PAVEMENT MARKING, AND MISC. ITEMS. ROUTES: 5 & 70 SECTIONS: 9 & 12 COUNTY: PULASKI LENGTH: 6.279 miles in length. THE FOLLOWING ITEMS AND APPROXIMATE QUANTITIES ARE INVOLVED: 401011 TACK COAT 26,976.00 GAL 407162 MA IN ACHM SURFACE(1/2") 16,837.00 TON 407452 AB(PG76-22)ACHM SURF(1/2") 1,018.00 TON 412002 COLD MILLING ASPHALT PVMT. 158,347.00 SQYD 415011 ACHM PATCH.EXIST.RDWY. 100.00 TON 601001 MOBILIZATION 1.00 L.S. 603010 MAINTENANCE OF TRAFFIC 1.00 L.S. 604003 SIGNS 1,640.00 SQFT 604041 CONST.PAVEMENT MARKINGS 68,373.00 LF 604045 CONST.PAVEMENT MARKINGS (WORD) 14.00 EACH 604046 CONST.PAVEMENT MARKINGS (ARROW) 14.00 EACH 604061 REMOVAL OF PERM.PVMT.MRK. 4,248.00 LF 704036 LOOP WIRING CLASS III (1C/16 A.W.G.) 8,826.00 LF 719002 THERMO.PVMT.MARK.WH(6") 57,355.00 LF 719004 THERMO.PVMT.MARK.WH(10") 1,448.00 LF 719005 THERMO.PVMT.MARK.WH(12") 516.00 LF 719102 THERMO.PVMT.MARK.YL(6") 68,373.00 LF 719201 THERMO.PVMT.MARK.(WORD) 14.00 EACH 719202 THERMO.PVMT.MARK.(ARROW) 14.00 EACH 719205 THERMO.PVMT.MARK.(BIKE EMB.) 82.00 EACH 721002 RAISED PAVEMENT MARKERS-2 1,004.00 EACH