Specifications include, but are not limited to: A. GUARANTEED MAXIMUM PRICE/FAST-TRACK MANAGEMENT, B. PRECONSTRUCTION SERVICES, C. COLLABORATION WITH DESIGN TEAM, D. COST ESTIMATING, E. EVALUATION OF UNIVERSITY'S PROJECT PROGRAM WITH REGARD TO CONSTRUCTABILITY AND SCHEDULING, F. SUBCONTRACTOR SELECTION, PROJECT AND CHANGE ORDER PRICING, G. DEMOLITION, H. CONSTRUCTION OF SELECTED IMPROVEMENTS I. SCHEDULE CONTROL, J. COST REDUCTION AND CONTROL, K. PROJECT COORDINATION, L. AS-BUILT DOCUMENTATION, M. CLOSEOUT, N. WARRANTY. O. Due to the unique location of the worksite, specialized design approaches will be needed to ensure the development of the site and the design of the pathway blends with the surrounding areas and meets all regulatory requirements. In addition, construction activities must be performed in a manner that minimizes disruption to traffic and does not interfere with the events that take place on campus