Specifications include, but are not limited to: The SOQ’s will be used for selection of engineers for a project that entails the expansion of Siloam Springs Moss Substation. Planned expansion includes the addition of a second power transformer to the station, a minimum of three additional distribution feeders, extending the existing 69 KV transmission bus, and the addition of a second 12470 / 7200 bus system. Additionally, engineering will be required for the expansion of the existing substation control house to accommodate for needed protective relays and devices, extending existing station grounding grid, and other necessary items needed for a safe and functional distribution substation. Anticipated starting date for engineering work is Summer / Fall of 2020.