Concrete Curb and Gutter (Contractor is responsible for all phases of work to completion) 1. 4" high roll curb, 2' wide x 6" thick gutter base plf $ 2. 6" high upright curb, 2' wide x 6" thick gutter base plf $ 3. 0'-4' Stormwater standard Inlet with top, lid, ring, and manhole cover ea $ 4. 0'-6' Stormwater standard Inlet with top, lid, ring, and manhole cover ea $ 5. Vertical Foot of depth over 4' pvf $ 6. 4' wing extension on inlet throat and top pvf $ 7. 6" Monolithic curb & gutter plf$ Concrete Sidewalk Cut and Permanent Replacement, Complete 1. 0.1 through 3.0 SY per job site psy $ 2. 3.1 through 10.0 SY per job site psy $ 3. 10.1 through 20.0 SY per job site psy$ 4. 20.1 through 40.0 SY per job site psy $ 5. Form Street Box Drains w/ring & lid -Form only ea$ 6. Form Street Box Drains w/ring & lid - complete construct ea $ 7. 0.1"- 4.0" Monolithic Slab psf $ 8. 4.1"-6" Monolithic Slab psf $ Exposed Aggregate Sidewalk Cut and Permanent Replacement, Complete 1. 0.1 through 3.0 SY per job site psy $ 2. 3.1 through 10.0 SY per job site psy $ 3. 10.1 through 20.0 SY per job site psy $ 4. 20.1 through 40.0 SY per job site