Specifications include, but are not limited to: n addition to the below materials, the contractor is responsible for all of the following: • All labor for running, terminating/fusing, labeling, and testing/certifying cable. • All tools required for running, terminating/fusing, labeling, and testing/certifying cable. • Any fasteners/straps/anchors/hooks necessary to support cabling runs, • Any conduit required for cable pathways. • Any tools and labor required for creating new cable pathways through walls. General Note: For any device used for cable support, whether J-hook, caddy straps, or ladders racks, do NOT exceed 50% of support capacity. • Indoor Network Cable – o For new wireless unit network drops - Cat6 blue jacket plenum 550mhz. ComCables model BC-C6EPL-BL preferred. o For point-to-point runs between locations and FOP closets – Cat6 orange jacket plenum 550mhz. ComCables BC-C6EPL-OR preferred. • J-Hooks/Tri-Hooks - Follow manufacturers printed instructions for installation. Support cable bundles at 4 feet on center maximum. Do not exceed 50% of hook. Maximum fill-50 cat 6 equal to B-Line J hook p/n BCH64 Anixter p/n 222878 max fill- 150 cat 6.