SCOPE OF WORK A. Contractor shall provide all work, supervision, labor, materials, transportation, scaffolding, clean up and any other services necessary to perform the construction of this project, complete in every detail, within the limits shown on the construction documents. B. The scope of work for this portion of the contract shall be the performance of all work required to construct the structure including installation of site utilities. C. Contractor shall provide all fencing and materials required for secure staging and storage of materials on site. 1.03 WORK BY OTHERS A. The Contractor shall thoroughly familiarize himself with all work to be performed by others, its interface with this Contract, its affect on the scheduling of this Contract and its impact on the Contractors use of the site. 1.04 CONTRACTOR USE OF SITE AND PREMISES A. The Contractor is cautioned that this project consists of work in areas of the campus which are highly congested with student traffic at times during the day. B. Storage and staging will be allowed only in fenced in areas agreed to by the Owner and Contractor. The Contractor shall not block or otherwise restrict access to adjacent building entrances, emergency exits or sidewalks at any time during normal institutional operating hours. C. Parking will be limited to areas agreed to by the Owner and Contractor. Access to the project site will be strictly limited to only those vehicles required for delivery of materials, tools, etc. D. A pre construction conference will be held to assist Contractors in coordinating the use of the site, parking, etc. E. Comply with pertinent provisions of the General Conditions included in this project manual. F. Clean Up During Construction: During the process of work, keep the project clear of all rubbish. Keep all campus streets adjacent to the project free of dirt, gravel, concrete and other materials transported to and from the project.