Specifications include, but are not limited to: A. The vendor shall provide a minimum of two (2) example projects and a minimum of three (3) references of successful projects completed with contact information. B. The vendor shall prepare the subgrade and footing to install the flagstone and conduct the project according to local codes and standards acceptable to the Arkansas Historic Preservation Program. C. The vendor shall provide a bid bond equal to five (5) percent of the bid amount. A certified check issued to the City of Little Rock is also acceptable in lieu of a bid bond provided by a bonding agency. D. The vendor shall remove and stack existing flagstones on pallets for transport by the Owner to the Owner’s on-site storage facility. Flagstones will be accessible to the vendor for the work process. E. The vendor shall install all flagstone in exterior mortar bed with a similar pattern and joints to the existing design. F. The vendor shall install the flagstone in a flat level proper manner allowing for drainage, transitions and other site irregularities. G. The vendor shall install river rock between the flagstone walks and the pavilion and H. The vendor shall wash and clean the installed flagstone to remove excess mortar. I. The vendor shall address any issues with the installation after inspection of the completed work.