Specifications include, but are not limited to: This item shall consist of cold milling the asphalt pavement at the location designated on the plans or by the Public Works Director and removing the resulting material from the street right-of-way. Unless otherwise provided, the reclaimed pavement shall become the property of the Owner. The pavement remaining after milling shall provide a surface suitable for maintaining traffic. Equipment: The Contractor shall provide self-propelled equipment with sufficient power, traction, and stability to maintain an accurate depth of cut and slope. The equipment shall be capable of accurately and automatically establishing profile grades along each edge of the machine by referencing from the existing pavement by means of a ski or matching shoe or from an independent grade control and shall have an automatic system for controlling cross slope at a given rate. The milling machine shall have an effective means for preventing dust, resulting from the operation, from escaping into the air. Provision shall be made, either integrally with the milling machine or by the use of additional equipment, to remove the material being cut from the surface of the roadway.