Specifications include, but are not limited to: Provide design assistance and services necessary to finalize the design to a point where the CMAR can provide a GMP for the work. Identify any and all permits necessary to commence and finish the construction work and assign responsibility to the concerned parties for obtaining the respective permits, and document City and CMAR agreed assignment for obtaining; Review the existing plans and specifications and provide comments regarding constructability, required clarifications and measures to reduce costs; Provide alternate systems evaluation and constructability studies; Participate in other project meetings with the City or the Design Professional to include at least one City Council meeting per GMP contract proposal; Advise the City of ways to mitigate time and impact of construction activities on the general public; Provide project planning and scheduling including the design and construction phase schedule, utility locates and potholing as required; Perform subsurface exploration within the limits of the work and the vicinity of the project as required to avoid or minimize conflicts with utilities; Identify staging area(s) needed for the work; Develop site specific SWPPP and emergency operations plans;