Specifications include, but are not limited to: At a minimum, the Contractor will be expected to successfully perform the following construction services, including, but not limited to: ▪ Water meter service connections: ▪ Furnish and installation of water service pipe and fittings from main to meter identified by City Staff: ▪ Repair and replacement of service saddle and corporation stop: ▪ Water meter relocations: ▪ Service terminations: ▪ Restore existing landscaping and irrigation systems: ▪ Removal and replacement of existing concrete curb and gutter, sidewalk and driveways: ▪ Permanent and temporary asphalt, concrete pavement replacement: ▪ Provide information reflecting changes to the asset registry and geographical information system (GIS) data for new and replaced hydrants, valves and main: ▪ Locating and providing asset management requirements: ▪ Minor design services as required to replace water services with work completed by Arizona registered professional engineer to provide plans for permitting: ▪ Other services as required to support successful completion of the work and the City’s interests.