Specifications include, but are not limited to: 1. Excavate the wall to the existing footer, if required. 2. Pressure wash wall to clean and remove loose stucco etc. 3. Score out horizontal joints to remove loose material, fill joints with sealant and glue. 4. Cut out sections that may be required to be replaced or reset. 5. Fill holes with concrete. 6. If required, construct forms as may be required for concrete to set. 7. Replace all types block with equal or better block in areas where necessary with matching size and type block as required. 8. Waterproof cement patch as required. Total Seal or approved equal. 9. Apply a thick coat of stucco with bonder and glue to match existing texture and pattern. 10. Apply two coats of paint (paint color will be selected by CITY – intent is to match existing). 11. Return grade and clean up around wall to pre-existing conditions or as directed by the Contract Administrator/designee. Special attention is to be made to have the alleys in equal or better condition upon completion.