Specifications include, but are not limited to: • Removal of roadway pavement markings using vacuum recovery and in a manner that does not damage the pavement surface, whether the surface is asphalt or Portland Cement concrete. • Application/Installation of roadway pavement markings in paint, thermoplastic, preformed thermoplastic, preformed roadway marking (tape), or other material, as may be required on asphalt or Portland Cement concrete, including, but not limited to long lines, short lines, legends, and arrows. • Installation of Raised Pavement Markings (RPMs), as may be required by plans, schematics, and traffic engineering direction. • Contractor must be able to understand and follow plans and/or schematics, traffic engineering direction, and City of Phoenix standards