Specifications include, but are not limited to: The project generally consists of the construction of new sidewalk ramps at intersections and construction of new sidewalks along street frontages in accordance with ADA requirements and Public Right of Way Access Guidelines (PROWAG). The work is located within the area bounded by South Marshall Street on the west, South Picacho Street on the east, East Ash Avenue on the south, and East 1st Avenue on the north. Principal/major items of work include the following: New Sidewalk Curb Ramps – 9 total Pavements Street Pavement Removal and Replacement – 98 SY New 6” Thick Sidewalk at Driveway Crossings – 870 SF New Valley Gutter and Apron Areas – 966 SF New 4” Thick Sidewalk – 5,460 SF Miscellaneous Pavement Removals Miscellaneous Items of Work Utility Adjustments, Sign Relocations, and Removal or Relocation of Posts and Fencing