A. Contractor is responsible to visit site to ascertain the Full extent of the work required. No additional Compensation will be allowed for failure to ascertain full extent of the work required through visual inspection of existing conditions and that detailed and Specified within the contract documents. B. Contractor to review specifications prior to bid and immediately notify architect of any conflicts. C. All mechanical units, exhaust fans, etc. mounted on the roof shall be provided with cricketing. D. All mechanical roof mounted equipment to meet proper curb requirements and penetration openings E. Not all penetrations may be indicated, Contractor to field verify before submitting bid. F. Some new coping, gutters, and associated details. G. Contractor is responsible for inspecting interior roof leaders to ensure that they are not leaking. If leaks are discovered, the contractor shall notify the owner and the architect. H. Interior ceiling tiles that are stained or damaged are to be replaced.