Specifications include, but are not limited to: The furnishing of all labor, materials, equipment, fixtures and services required for micro-milling of existing ACFC pavement and placement of a dual-layer (Type II and Type III) microsurface at Pioneer Parkway and a dual-layer (Type II and Type III) microsurface on State Route 89 in Prescott, Arizona. The project length for Pioneer Parkway is 2.4 miles and the project length for State Route 89 is 1 miles. Total estimated quantity of area to receive micro-milling is approximately 90,992 square yards. The total estimated quantity for Type III microsurface is approximately 132,227 yards and Type II is approximately 90,404 square yards. Other associated works include 2,442 gallons of fog seal coat at Pioneer Parkway and associated roadway striping at both locations. All work is to be done in accordance with the plans, specifications, and contract documents