Specifications include, but are not limited to: Demolition and renovation to four (4) circular rooms located on first floor of Window Rock Administration Building One #2559. Demolition: The contractor will demolish and dispose all materials relating to the deconstruction of the existing walls, ceilings, and fixtures to complete improvements. Circular Rooms: • Removal of circular private rooms • Demolition of sheetrock, cove base, metal studs • Receptacles, light switches, and lights will be removed and relocated • HVAC duct work will be closed up or rerouted Installation: The contractor will furnish all labor and materials necessary to complete the installation and upgrade of this project. • Close open walls • Hang 5/8” gypsum walls, tape, texture, prime and paint finish walls • Install matching carpet and cove base • Install new receptacles, light switches and light fixtures • Install acoustical ceiling tiles, matching with existing tiles • On one circular room, need to install a new left hand steel door