Specifications include, but are not limited to: • Participate in a technical scoping meeting with NAIPTA and City of Flagstaff. • Participate in project kick off meeting with project stakeholders. • Participate in ongoing regular OEC (Owner, Engineer, Contractor) during design through construction phase. • Coordinate design reviews of the project as the design develops with the selected CMAR Contractor. • Provide a Geotechnical Report and recommended pavement section(s) and related geotechnical items. • Coordinate with City of Flagstaff and franchise utilities to investigate and determine location of existing utilities and if relocation work is necessary prior to construction. • NAIPTA will provide Design Professional with topographic survey sealed by a Professional Land Surveyor for the project area. DP will provide a project base map to incorporate the topographic survey and will compile right of way, parcel and easement lines. DP will identify existing utilities including subsurface invert elevations. • Review 2015 Kaspar Intersection Analysis traffic study and confirm traffic operational requirements such as queuing, lane storage length and traffic signal timing. No traffic study updates for traffic modeling or data collection are anticipated.