Specifications include, but are not limited to: A. The scope of work will include work tasks as requested and described below on wet utility pipeline construction projects including water, wastewater, reclaimed water and storm drainage. The work is required to support the City of Peoria Capital Improvement Program (CIP). B. Other related work such as public involvement, utility relocation, traffic control, road repair, etc. as more fully described below may also be required. C. Design services and/or post design services may be requested for some of the projects. The scope of work for design or post design services, when applicable, will be defined by the City. All as-builts required to be completed as part of the post design services shall be in accordance with Chapter 3 of the Peoria Engineering Standards Manual. D. The following work activities may be included in individual projects. Not all activities will be included in all projects. Subcontractors and consultants may be used to accomplish some tasks. 1) Public Involvement – prepare and distribute public notices, attend public meetings, maintain a construction hotline. 2) Permitting – obtain all necessary permits required to complete the project, including but not limited to; Engineering Off-site, haul route, stockpile, SWPPP, dust control, traffic control plans, MCESD approval to construct, approval of construction, etc. 3) Installation of new water, reclaimed water, wastewater and storm drainage pipelines including all related work. 4) Rehabilitation of water, reclaimed water, wastewater and storm drainage pipelines and appurtenances including all related work. 5) Placing asphalt pavements including full depth sections, overlays, patches and repairs to restore areas damaged by construction. 6) Placing concrete pavements including curb and gutter, driveways, sidewalks, to restore areas damaged by construction. 7) Installation of landscaping to restore areas damaged by construction. 8) Utility locating (potholing) underground utilities and obstructions.