The following work activities are general in nature and may be included in individual projects. The successful contractor(s) must hold the proper license in good standing with the Arizona Registrar of Contractors (AZROC) and shall have experience, knowledge, and ability to accomplish the following tasks. 1. Constructing ADA accessible features including: ramps, warning features, way-making features, and other improvements to meet ADA requirements. 2. Crack seal (all types) 3. Asphalt Patching (all types) 4. AC pavement Rejuvenators (polymer modified rejuvenating emulsion) 5. Sealcoats (PMM, LiquidRoad, Onyx, Guardtop etc.) 6. Slurry seals (all types) 7. FAST (all types e.g., high vol & low vol) 8. Thin Overlays (hot applied, all types) 9. Asphalt Milling 10. HMA (for overlays, new construction, etc.) 11. Obtain all necessary permits required to complete the job order, including but not limited to; Glendale Development Services, SWPPP, dust control, traffic control plans, right-of-way, etc. 12. Conduct project meetings as necessary to maintain the project budget and schedule, set agendas, and prepare and distribute meeting minutes. 13. Subgrade preparation including compacting native soil, placing, and compacting sub-grade materials, and grading. 14. Coordinating with utility companies and/or the City to replace, relocate, remove, or install street light systems, traffic signal poles, mast arms, control equipment, traffic signal equipment, loop detectors and detection equipment.