Specifications include, but are not limited to: 1.Demolition and Clean Up: Remove all trash and construction debris fromproperty and dispose of in an approved manner.2.Landscaping: All landscaping is to be preserved to the extent that is practical to perform the construction tasks described herein. 3.Fences: Temporarily remove and preserve existing fence as neededto facilitate construction. Re-install at the end of construction. 4.Termite Treatment: Treat for termites by an Arizona licensed contractor and provide certificate. Include one (1) year warranty with option for owner to renew. 5.Exterior Walls: a.Repair: Prep and paint. Patch as necessary and patch after new window and door installation. b.Paint: Full coverage with exterior latex Dunn Edwards paint or equivalent. 6.Exterior Doors: Replace all pre-hung exterior doors as indicated on the plan with solidcores. Replace and install new hardware, keyed alike and provide weather-stripping.a.Paint: Full coverage with exterior Dunn Edwards paint or equivalent.b.Hardware: Install Quickset brand hardware and include weather-stripping.7.Windows: Replace allwindows per plan. Windows should be vinyl, double pane, energy star rated. All bedroom windows to meet egress.8.Roof Structure: Remove existing roof and cross framing. Coordinate with insulation contractor for attic insulation installation. Install ½” roof sheathing with factory installed radiant barrier.9.Roofing Material: Install Duro-Last PVC Thermoplastic over Duro-Guard XPS Fan Fold system (or preapproved equal) per all manufacturer specifications. Flash all valleys, penetrations and transitions.10.Exterior Trim: Replace entire perimeter.a.Material: 2 x 6 S1S2Eb.Paint: Full coverage with exterior latex Dunn Edwards paint or equivalent.