Specifications include, but are not limited to: 1. Asphalt Milling- Contractor shall mill a minimum of 2” following the existing profile of the surface in accordance with Maricopa Association of Governments Uniform Standard Specifications and Details for Public Works Construction, Section 317. 2. Tack Coat - Materials and method of application shall conform to the requirements as specified in the Maricopa Association of Governments Uniform Standard Specifications and Details for Public Works Construction, Section 329. Rate of application shall be 0.10 gallons per square yard. Cost for this item shall be included in the price of the asphaltic surface course. During the distribution of the tack coat and resurfacing operations, precaution shall be taken to prevent the dragging and spreading of asphaltic material on surrounding streets, sidewalks, driveways, and curbing.