Specifications include, but are not limited to: Reconstruction of an approximately 1,500’ of Camino Gilberto as a one-way crowned roadway along with a contiguous earthen lined channel including an 10’ bottom width to convey runoff within/along the roadway thereby resulting in a reduction of adjacent flood depth(s) to help reduce the size of the federally mapped Special Flood Hazard Area, Zone A, that is affecting the project area. Reconstruction of approximately 400’ of Camino Ramanote to adequately allow flow conveyed along Camino Gilberto across and into the Agua Fria. Six driveway sections in the public right of way will be improved to provide a concrete surface thereby eliminating erosion and allowing for direct access. The major items associated with this project are: 595 tons of asphalt, 890 cubic yards of aggregate base course, 3,108 linear feet of concrete header curbing, and approximately 8,700 square feet of new concrete driveways.