Specifications include, but are not limited to: Trail specifications: Soldiers Trail. The soldiers trail is a class three trail with a tread width of 4’, 2% out slope, and a minimal amount of drainage features. The finished trail should have a relatively smooth tread and few obstacles. The trail will be composed of a native soil surface. Vegetation clearance should be 8’ wide and 10 ‘tall to accommodate horse traffic. Bridge trail. The bridge trail is a class 2 single track trail, with a 10”-18” tread this trail is intended to be a more difficult hiking and biking trail, class 2. The tread is intended to present obstacles, vegetation clearance is 6’ wide and 8’ tall. Trail relocation: We have just over one mile of trail that will be relocated due to poor design and erosion issues. The trail will be roughed in with mechanized equipment and will require hand finishing and vegetation clearing. Trail maintenance: There will be approximately 4 miles of trail maintenance on the Soldiers trail. Maintenance will be to put the trail back into specifications.