Specifications include, but are not limited to: FIRE SUPPRESSION SYSTEM MAINTENANCE: Semi-Annual Chemical Suppression to include (all this applicable): 5.2.1. All inspections shall include maintenance and testing procedures according to NFPA 12A, 10, 72, 72E, NFPA 70 Article 760, 96 and 101. 5.2.2. Inspect and Test Electrical Equipment 5.2.2.1. Control Panel – all functions 5.2.2.2. Graphic Annunciation Panel – proper illumination 5.2.2.3. Detection 5.2.2.4. Clean detectors (material included) 5.2.2.5. Check detector sensitivity 5.2.2.6. Test alarm modes (sequence) 5.2.2.7. Operate time delay mode (60 seconds max) 5.2.2.8. Manual Releases – Pull Stations 5.2.2.9. Audible/Visual Alarm Devices 5.2.2.10. Releasing Devices – electrical actuator 5.2.2.11. Pressure Switch (Valleywise Health permission required) 5.2.2.12. Equipment shut down (Valleywise Health permission required) 5.2.2.13. HVAC < Fan Shut Down (Valleywise Health permission required) 5.2.2.14. Abort station operation 5.2.2.15. Check battery back up 5.2.3. Inspect and Test Mechanical Equipment 5.2.3.1. Weight Cylinders – Check Liquid Levels 5.2.3.2. Check Tank Pressures 5.2.3.3. Check Present Piping Against Prints 5.2.3.4. Check all Nozzles – Caps 5.2.3.5. Record hydrostatic test dates (Cylinders) 5.2.3.6. Releasing Devices – Mechanical, Pneumatic 5.2.4. Miscellaneous 5.2.4.1. Check EPO operation (Valleywise Health permission required) 5.2.4.2. Bell striker adjustment 5.2.4.3. Check magnetic door holder 5.2.4.4. Check damper operation 5.2.4.5. Battery charger adjustment 5.2.4.6. Check for room integrity 5.2.5. System Certification 5.2.5.1. Panel Certification Sticker 5.2.5.2. Tag each cylinder 5.2.5.3. Add tamper devices (seals)