Specifications include, but are not limited to: Inspect features (while running) for leaks, gasket failures, missing/damaged components, etc. Inspect the state of the fiberglass/gel coat of the features for cracks, chips, and breaks. Inspect the stairs, walkways, handrails, and landings for safety issues, and general appearance. Inspect features for overall safety of operations and any other relevant findings not listed above that pertain to industry standard. Inspect all hardware for loose/missing connectors. Inspect all connection points for proper operations (attachment points, grease fittings, bushings, etc.) Provide a written inspection report within two (2) working days of completion for each facility detailing the initial findings, recommendations for remedial work, and a quote for extra work to be performed. Pressure wash exterior of features to remove dirt, oxidation, etc. from fiberglass surface. Remove calcification from exterior prior to waxing. Wax the exterior of feature. Buff the exterior of the feature.