Specifications include, but are not limited to: The work consists of milling and/or pulverizing, pavement preparation, seal coating, paving, and striping of the residential streets in three (3) separate neighborhoods; Step One – As-built existing striping and GPS existing pavement grades. Step Two – Pre-lower utilities, weed eradication, and tree trimming. Step Three – Remove and replace ADA ramps per location maps provided. New ramps are only to be installed where there is existing sidewalk. Step Four – Sawcut and mill minimum of 3” into existing Asphalt Concrete (AC) and Aggregate Base Course (ABC)/subgrade. Step Five – Compaction and finish grading of the material, as outlined in Standard Specification 205- 3.04 Compacting and Finishing, will follow directly behind the milling. The previously created GPS pavement grades willbe usedfor the finish grading. Step Six – Pave with three inches (3”) TDOT Asphaltic Concrete (No. 2) (PG70-22TR+) or similar terminal blend asphaltic pavement. Step Seven – Complete utility adjustments, and re-stripe.