Specifications include, but are not limited to: 1. Signal Butte Road Phase 2 (S885) - The Project consists of approximately ¾ of a mile of half street surface improvements to include concrete curb and gutter, sidewalk, box culvert extensions, bridge widening, paving, striping, signage, street lights, street sleeves, landscaping & irrigation. The improvements also consist of storm drain installation to stub west of the Flood Control District of Maricopa County (FCDMC) channel. Box backfill per ADOT. 2. Eastmark Parkway Phase 2 (S893) - The Project consists of approximately 180 linear feet of half street improvements. Improvements include water service relocation, box culvert extension, dry utilities, concrete curb and gutter, sidewalk, paving, signage, sidewalk sleeves, landscaping and irrigation. Box backfill per ADOT.