Loading...
Skip to main content
< Back to results

DESIGN BID BUILD PROJECT


Location
Arizona
Publication Date
06/11/2019 02:51 PM EDT
Closing Date
07/08/2019 04:00 PM EDT
Issuing Organization
Tucson Airport Authority
Solicitation Number
Description

Specifications include, but are not limited to: rehabilitating the full length of Taxiway D and connector Taxiways D1 and D3.^ Reconstruction of the existing 25-foot wide structural shoulders and removing 25-foot erosion control pavement on the outboard edge of the shoulders.^ The rehabilitation of the mainline structural pavements will consist of a 3.5-inch mill and overlay.

Get instant access

Get instant access to solicitation details & future business opportunities.

to solicitation details & future business opportunities.

Get Access

Vendor packages with access to similar open solicitations

Matching bid notifications & access to all Statewide & Group bid details

Statewide

Matching bid notifications & access to all Statewide & Group bid details

Matching bid notifications from participating agencies

Group

Matching bid notifications from participating agencies

Access participating agency bids

Basic

Access participating agency bids