Specifications include, but are not limited to: The work consists of a full tear off the current roof assembly to the original deck to include legal disposal of those materials off site and installing a complete metal roofing system on an existing facility, as described in the Contract documents. Work will include an entire metal roofing system, which includes the metal roof panels, fascia panels, fasteners, connectors, roof securement components, and assemblies tested and approved in accordance with UL 580. This includes roof penetration items such as vents, curbs, interior or exterior gutters, downspouts, splash blocks, and any other flashing components that are part of a complete metal roofing system. As part of the base bid Contractor to include raising, removing and reinstalling any plumbing jacks, heat stacks, water feeds, gas line, water lines, HVAC curbs, passive and active vents, roof drains, cooler stands, ladders, HVAC units, electrical, and plumbing leads and any other components