Specifications include, but are not limited to: 2.1. Contractor shall provide all materials, personnel and equipment sufficient to complete this project in a timely manner. 2.2. Contractor shall excavate dirt and material to access the pipe, approximately 7 to 8 foot deep. The trench is partially open at this time and backfill material is on site. 2.3. Contractor shall remove approximately 87 feet of 3” HDPE pipe from trench and dispose of properly. Any and all metal valves will be returned to service if operating correctly. Remove and return to owner, a new patch coupler from the HDPE pipe prior to disposal. 2.4. Contractor shall remove failing saddles from Chlorinator and dispose of properly. Provide and install two new Brass Saddles 3” x 1” on the approximately 87 feet of new 3” Ductile Iron Pipe. 2.5. Installation of the ductile pipe will require a minimum of four new mechanical couplings.