Specifications include, but are not limited to: The project will require the demolition and replacement of the existing air handling units #1 & #2 located in the basement of the Executive Tower. Demolition and replacement includes existing fans, coils, piping, ductwork, controls, electrical panels and connections. The project will require temporary cooling for the occupants while the work in the construction phase is being completed. The selected CMAR will work as a team with ADOA, FOAM and the Architect/Engineer Design Team to ensure an efficient and cost effective design approach for the project. The project site is located at 1700 W. Washington St., Phoenix, AZ 85007. The estimated construction cost for this project is $1.9 million. The estimated completion time for the construction phase of the project is 4 months