Specifications include, but are not limited to: The engineering firm will be required to perform design and construction administration and inspection (CA&I) services, on an as-needed basis for the water and wastewater facilities to support the work of the Job Order Contract (JOC) Contractors. Individual projects will be identified by City staff for implementation under the JOC Program. Projects will differ in size, scope, and complexity. These projects are generally related to asset replacement or renewal and repair of varying complexity. At any given time, there may be several projects in various stages of implementation. The selected engineering firms will be required to manage all projects in all phases simultaneously, and to coordinate with City staff and the City’s JOC contractors. The selected firms will be expected to successfully preform the following tasks, including, but not limited to: • Design new or enhanced process control systems, including integration into current control systems, and adding or upgrading instrumentation and control elements (i.e., actuators, variable frequency drives, etc.). • Design the refurbishment or replacement of electrical and process control panels. • Design the refurbishment or replacement of remote terminal units, programmable logic controllers and Remote input/output panels. • Provide the design for electrical distribution systems improvements to support process automation systems and electronic security systems. • Provide design of conduit and duct bank installations for power and control wiring, and fiber optic cables. • Provide design services to install perimeter walls, antenna and camera poles, concrete pads, sunshield canopies and other physical infrastructure necessary for the installation of process control equipment and electronic security systems. • Provide construction administration and inspection services. The duration of this consultant services contract will be for three years, with the option to extend an additional two years, up to a maximum contract duration of five years. Funding may be added with each extension depending on the fiscal needs for the project.