Replace the existing playground equipment with new 2-5 and 5-12 structures with static play equipment (jungle gym, monkey bars, slides, climbing equipment) and swing sets; update ADA parking and access to the playground; add an exercise area in the playground; upgrade lighting adjacent and in the playground; replace the sand play pit with engineered wood fiber and add 2 shade structures, (1) hip roof shade canopy; powder coat steel frame, and HDPE UV shade fabric covering and (1) doble hip roof shade canopy; powder coat steel frame, and HDPE UV shade fabric covering. All equipment is going to be fixed and will not be movable. Other ADA upgrades will occur at the park’s restroom, including insulating pipes below lavatory to protect against contact, update flush control handles to ADA requirements, and reposition flush control handles.