Part I: Scope of Work The services of the contractor are to be of a scope and quality performed in a reasonable, diligent, and careful manner. New installation or maintenance of the Ansul System Units shall be provided in accordance with the highest standards of professionalism, skill, workmanship, and applicable trade practice and shall conform to all applicable codes and regulations: 1. Complete an assessment on the condition of Ansul System Units consistent with applicable industry code and compliance standards. 2. Upgrade and install Ansul System Units in accordance with applicable industry code and compliance standards. 3. Provide labor, supplies, parts, and equipment for the Ansul System Units. 4. A timeline of 2 Ansul System Units will need to be completed on or before September 30, 2025. 5. Warranty Service: Extended warranty parts and labor (define maximum number of years available). 6. Ensure service cost such as labor, travel time, mileage, parts, and supplies are reasonable and are for the work completed for the applicable Ft. Defiance DALTCS Program. 7. Each scope of wok shall include all applicable Navajo Sales Tax of 6% (24 N.N.C. Section 601 et. Seq.) associated with each project (Section S. Part 4). 8. 9. Contract is subject to availability of funds. The contractor will demolish and dispose of all materials related to the replacement of the Ansul System Units. Materials will be used, recycled, or disposed of as applicable and in accordance with EPA and NNEPA Regulations. 10. The contractor will furnish all equipment, materials, and labor necessary to complete the installation of the Ansul System Units. 11. All Ansul System Units installation and equipment shall not be proprietary for all information relating to the equipment and installation upon completion shall become property of the Navajo Nation to include any software or codes used for the maintenance or repair for the system. 12. Thorough training shall be furnished to Ft. Defiance DALTCS Staff by the contractor on the installed equipment and materials upon completing of each Ansul System Units installed.