Scope of Work Key Objectives and Requirements: The SOW emphasizes several critical aspects for the construction of the new parking lot: • Longevity and Maintenance: The parking lot must be constructed to have the longest possible life and the lowest maintenance cost, using high-quality materials and workmanship. • Design Compliance: The design by Hooghan, LLC, is to be strictly followed. • Pavement Thickness: A conservative pavement thickness, as recommended in the design, is to be used to support daily vehicle traffic, including dumpster trucks. Subbase and Base Layer: The subbase must be checked for adequate compaction, with no visible water or movement. The base layer/subsoil must be firm and unyielding under the pressure of repeated construction trucks.