General Scope of Work: - Remove dock seal and bumpers at subject loading dock and walkway areas. - Remove metal railing, tracks, and all appurtenances; loose equipment shall be removed by Owner; Remove electrical disconnect and to accommodate masonry work required at subject door; Remove portion of concrete slab. - Rebuild concrete flooring (4000 psi) to align with adjacent (proper) conditions; Maintain Control Joint next to the column; re-caulk with an appropriate joint sealer; Existing steel structural components are to remain during repair. - Patch and repair damaged concrete at base of column and pier adjacent to subject loading dock and walkway areas; Paint new and patched concrete to match adjacent walls (both sides); paint color TBD. - Reinstall all door and metal railing components. - Reinstall electrical disconnect. - Install new dock seal and bumpers