1-The permit for deck removal and replacement project will be issued once the project is awarded and that selected contractor submits a plan for approval to the MLBO Building Official. All work to meet local and state codes. Include MLBO Building Permit costs. 2- Provide materials and labor to Seal (Treat) all Cut Ends of new Treated Wood and Lumber to prevent future wood rot. Use ZINSSER Green Wolman Copper Coat WoodLife. This is a necessary step to receiving final permit sign off. 3- This deck and wheelchair ramp location is the main entrance to the home. Full replacement including deck, wheelchair ramp (handicap accessible ramp), posts, railings, decking, anchors, hardware, adjacent steps for able bodied use as exists will be replaced completely, caulking and or glue as needed. The railing system requires a graspable secondary handrail that will attach to a 2 x 6 top cap and the drop down 2 x 6 horizontal board. All lumber used in the top cap, handrails will be sanded extensively to ensure smoothness. 4- The new deck and ramp Concrete Footings, Posts & Framing will not fasten to the home. Please, plan for free standing to support deck and ramp. 5- Deck Board spacing will not exceed 1/8” to ensure a relatively smooth surface for wheelchair wheels. 6-Contractor to attempt One inch rise for every One foot of the ramp length. (Space is limited). Please, address as part of the final plan to be approved by MLBO. 7-Include a CONTINGENCY ALLOWANCE OF $1,200.00 in total. 8-Include the ½ % TERO Tax.