Specifications include, but are not limited to: This Request for Qualifications scope includes Phase One of the planned projects. The purpose of Phase One is to expand SPD’s secure parking area and to provide a new building for secure Property and Evidence (P&E) storage in a new pre-engineered metal building (PEMB). The short-term intent of the PEMB is to function as a secure, stand-alone P&E work space and storage location while the existing police station undergoes future building additions. Long-term, the PEMB will be used for miscellaneous police storage. The selected CMAR will be expected to participate as part of the design team and work closely with the Engineer and the Town throughout the project. The CMAR will: • Provide pre-construction services, as requested by the Town and Engineer, in conformance with the design-phase schedule. This will include identification and/or evaluation of cost and constructability alternatives and schedule projections throughout the design process. • Provide construction adhering to the approved GMP contract terms.