Specifications include, but are not limited to: •Prepare schematic, design and up to three sets of construction documents. •Coordination with the Fire Department’s Labor/Management ‘Training Academy Design Team’ •Compile and evaluate existing information including utility maps for the project.•Perform all necessary field survey work to prepare the preliminary designs, architectural and engineering plans and specifications for the project.•Prepare and submit the necessary design of the project in accordance with the City of Tempe design standards. Attempt to design the project to achieve LEED Gold Certification.•Considerable public outreach will be required for this project. The design team will attend and prepare presentation materials for public meetings.•Obtain Development Review Commission (DRC) approval and City permits. •Perform all the necessary coordination with utility companies.