The scope of work includes furnishing of all labor, materials, equipment, fixtures and services required for a two-inch asphaltic concrete overlay on 21,388 linear feet of Old Highway 66 between Fort Rock Road and mile marker 133.5 in Seligman, Arizona. The project has approximately 11,196 tons of asphaltic concrete with PG 64-22 binder. Other associated work includes adjusting 2,600 linear feet of existing guardrail height, replacing 6 guardrail end treatment with MSKT TL3, removal of 5,660 linear feet of existing curb, shoulder build-up, and restoring pavement markings and striping. 1 2" OVERLAY ASPHALTIC CONCRETE PAVEMENT, 1/2" HIGH TRAFFIC, PG 64- 22 11,202 TN 2 BITUMINOUS TACK COAT (0.10 GAL/SY) 9,623 GAL 3 PAVEMENT MATCH TYPE "ML1" 2 EA 4 THICKENED EDGE PAVEMENT PREP 5,970 LF 5 REMOVE EXISTING CONCRETE CURB 5,290 LF 6 REMOVE EXISTING CONCRETE SPILLWAY 11 EA 7 SHOULDERING MATERIAL 484 TN 8 SHOULDER BUILD-UP AND GRADING 42,071 LF 9 EX GUARDRAIL HEIGHT ADJUSTMENT BY RAISING BLOCKS 2,413 LF 10 GUARDRAIL, W-BEAM, SINGLE FACE, STEEL POSTS W/ 8" MONDO BLOCKS 263 LF