Service Contract to have a Preventative Maintenance and Repair Service for the Bathrooms, Kitchen and wet areas at the Phoenix Veterans Hospital. This project will consist of the following elements but is not limited to these: pre-restoration work necessary before commencement of restoration process steps. Examples include removal of floor coatings/ caulking/polyurethane removal and replacement of partitions or work area impediments, grout sawing in cases where grout depth is insufficient to achieve permanent bonding of glazing compound. Below are some features of work but these are not all inclusive of all work needed to be accomplished on this project. It is the contractor’s responsibility to define and capture all work required to give the government a complete correction of the condition and appearance of the Medical Center floors. Contractor will clean, sanitize and prep the floors, followed by the SaniGlaze restoration process that will protect the tile and grout from contamination.